Plan the route before ordering gravel
A new entrance needs more than a visible strip of stone. Consider turning space, delivery vehicles, slopes and where water will cross the route. Soft subgrade needs attention before a compactable base and wearing surface are placed.
Signs to look for
- A new home or acreage needs dependable access
- The existing dirt track turns soft or muddy
- A long rural drive needs a stable base
- The route needs to shed rain and snowmelt
From subgrade to finished access
- 01Review access, slope, soils and likely water paths
- 02Prepare and shape the subgrade
- 03Install road base and gravel at depths suited to the site
- 04Build drainage into the profile, then grade and compact
What changes a new-driveway quote
Compare materials and scope with the gravel and road-base guide.
Questions about this work
What is road base?
Road base is a compactable blend of crushed aggregate and fines placed below the driving surface. It spreads loads and gives the upper gravel layer stable support.
Does every new driveway need a culvert?
No. A culvert is used where water must pass beneath the driveway. The site’s drainage pattern and any road authority requirements determine whether one is appropriate.
